·Drilling Holes in the Cleanroom Ceiling

Mark and drill holes at the corresponding positions on the cleanroom ceiling according to the dimensions of the air supply outlet box.

Note: Generally, the hole size should be 10mm larger than the length and width of the box respectively.

·Hoisting the HEPA Box

Lift the box into the ceiling hole and install the lifting lugs (as required by the engineering company for this project, the lifting lugs shall be flanged outward, with the outer dimensions of the lifting lugs larger than the ceiling opening size; the lifting lugs need to be installed on-site by the engineering company). Fix it to the lead screws or lifting hooks above the ceiling.

Adjust the height of the box until the lower flange of the box is flush with the ceiling.

Installation of HEPA box

Figure 1: Before installing the lifting rings

Installation of HEPA box-1

Figure 2: Inserted into the ceiling hole and lifting rings installed

Installation of HEPA box-2

Figure 3: Lifting lead screws installed and sealed with sealant

·Sealing Between the Box and the Ceiling

Apply sealant to the joint between the lower flange of the box and the cleanroom ceiling to prevent air leakage from the cleanroom.

·Thermal Insulation of the Box

If the exterior of the box is insulated up to above the ceiling, fill the gap between the box and the ceiling hole with filler before attaching the thermal insulation cotton to avoid condensation on the box.

Installation of HEPA box-3

 

Figure 4: After attaching the thermal insulation cotton

·Connection Between the Air Duct and the Box Interface

Connect the air duct to the air inlet interface of the box. When using a square external flange interface, drill holes along the external flange of the box's air inlet, connect it to the air duct flange with bolts and nuts, and fill the connection part with sealing material. When using a circular air inlet interface, use a hose clamp to fasten the flexible air duct to the box interface, ensuring that the hose clamp is positioned inside the anti-slip protrusion edge of the box's air inlet. If the box's air inlet interface is a side connection, first fix the air inlet interface to the box with self-tapping screws or rivets.

·Installation of the Air Volume Control Valve

If the purchase order includes an air volume control valve, install it before connecting the air duct to the high-efficiency air supply outlet box. Connect the air volume control valve to the air inlet hole of the box with self-tapping screws or rivets, fill the connection part with sealing material, and finally apply sealant around it. Note: During installation, the valve hole should be aligned with the box hole. This project's air outlets do not include control valves; the air valves can be installed at the interface between the main air duct and the branch air ducts.

·Thermal Insulation of the Box

If the exterior of the box is insulated up to above the ceiling, fill the gap between the box and the ceiling hole with filler to avoid condensation on the box.

·Installation of the Filter

Since HEPA filters use glass fiber filter paper, the filter media is prone to breakage and damage, leading to leakage. Therefore, do not drop or collide with the filter during transportation, unpacking, and installation, and strictly prohibit operators from touching the filter media with fingers or other objects.

a) Before installing the high-efficiency filter, clean and pre-blow the box to avoid dust contamination of the filter and reduce its service life.

b) Rotate the filter pressure blocks inside the box to an angle parallel to the corresponding frame (as shown in the installation diagram), and insert the filter into the box centrally (the gasket surface should face upward to contact the box).

c) Pull down the filter pressure blocks inside the box to the end of the lead screws in the box, rotate them to an angle perpendicular to the corresponding frame (as shown in the installation diagram), and tighten the pressure blocks around respectively.

d) Check if the torque of each pressure block nut is approximately the same; if there is a significant difference in tightness, adjust it to avoid air leakage from the filter frame.

Installation of HEPA box-4

Figure 5: Installation of the filter

·Installation of the Diffuser Panel

Cover the box with the diffuser panel and connect it to the box with flat-head bolts.